Our Services

Combination Mobile Crushing Plant

Combination Mobile Crushing Plant

Compared with fixed production lines,Combination Mobile Crusher have a shorter engineering period and rapider transition, which not only reduces the investment risk and opportunity cost of the investors, but also avoids the demolition and construction

C6X Series Jaw Crusher

C6X Series Jaw Crusher

C6X Jaw Crusher on structure and production efficiency present advanced modern technologies. Our Company's C6X Jaw Crusher can solve such problems of the existing jaw crushers as low production efficiency, difficult installation and maintenance. At pr

HGT Hydraulic Gyratory Crusher

HGT Hydraulic Gyratory Crusher

HGT Gyratory Crusher is a new-type intelligent coarse crusher with big capacity and high efficiency. It integrates mechanical, hydraulic, electric, automated, and intelligent controlling technologies which grant it with advantages traditional crushing

European Type Jaw Crusher PEW

European Type Jaw Crusher PEW

Jaw crushers has stationary jaw crusher, portable jaw crusher and mobile jaw crusher (crawler jaw crusher). Jaw crusher (PEW Series) is not only able to be used together with mine-selecting and gravel processing equipments but also be used independen

VSI5X Vertical Shaft Impact Crusher

VSI5X Vertical Shaft Impact Crusher

VSI Crushers Working Principle Raw material falls down into feed hopper, and then enters rotor through central entrance hole. It is accelerated in high-speed rotor, and then is thrown out at speed of 60-75m/s. When hitting anvil, it is crushed. Final

VSI Vertical Shaft Impact Crusher

VSI Vertical Shaft Impact Crusher

VSI Series vertical shaft impact crusher is designed by reputed German expert of SBM and every index is in worlds leading standard. It incorporates three crushing types and it can be operated 720 hours continuously. Nowadays, VSI crusher has replaced

VUS aggregate optimization system

VUS aggregate optimization system

The VU system is a global most-advanced dry-process sand-making system. The system is constructed like a tower. Its fully-enclosed layout features high integration. It integrates the functions of high-efficiency sand making, particle shape optimizatio

MTW-Z European Trapezium Mill

MTW-Z European Trapezium Mill

MTW European Grinding Mill is innovatively designed through deep research on grinding mills and development experience. It absorbs the latest European powder grinding technology and concept, and combines the suggestions of 9158 customers on grinding m

5X Series Roller Grinding Mill

5X Series Roller Grinding Mill

Grinding roller of MB5X Pendulum Roller Grinding Mill l adopts diluted oil lubrication. It is a technology initiated domestically which is maintenance-free and easy to operate. Diluted oil lubrication is oil bath lubrication, more convenient than grea

MTW Trapezium Mill

MTW Trapezium Mill

MTW European Grinding Mill is innovatively designed through deep research on grinding mills and development experience. It absorbs the latest European powder grinding technology and concept, and combines the suggestions of 9158 customers on grinding m

LM Vertical Mill

LM Vertical Mill

LM Vertical Grinding Mill integrates crushing, drying, grinding, separating and transport. The structure is simple while the layout is compact. Its occupational area is about 50% of that of the ball-milling system. The LM grinding mill can also be arr

TGM Trapezium Mill

TGM Trapezium Mill

TGM Super Pressure Trapezium Mill The operation principle of main unit of Trapezium mill is that main unit runs with the central shaft that is driven by a gear box. The top of the shaft is connected with a quincunx stand on which a grinding roller is

CONSTRUCTION OF CONTIGUOUS BORED PILE WALL

bored pile wall, the top 2 metres of the wall will be removed. If it is a sheet pile wall, the sheet piles will be extracted. First Level Strut The soil is excavated to the next strut level and the second level strut is installed. It continues till the excavation reaches the final depth or formation level. The number of strut levels depends on the

More

SP037 Specification for Contiguous Bored Piling

2.0 BORED CAST IN-PLACE PILES 2.1 General The Contractor shall carry out the works in accordance with a method statement which has been approved by the Engineer. This method statement shall include inter alia length of temporary casing, details of the constituent materials of

More

Specification for Contiguous Bored Piling

Specification for Contiguous Bored Piling 7 October 1999 . SPECIFICATION FOR CONTIGUOUS BORED PILING. 1.0 GENERAL . 1.1 Works in accordance with Specifications . The Contractor shall carry out the works in accordance with a method statement which has been approved by the Engineer. This method statement shall include inter alia length of

More

Contiguous Pile Wall as a Deep Excavation Supporting System

Contiguous Pile Wall as a Deep Excavation Supporting System cast-in situ pile method or precast pile method. Merits of column piles are less noise or There are three distinct bored pile wall options in current use: Contiguous wall, Secant wall and tangent wall. Contiguous pile walls are constructed with small gaps between adjacent piles

More

(PDF) Method Statement BORED PILING ResearchGate

The method statement for bored piling below describes the whole construction. procedures including material and equipment required for the construction of. bored cast-in-situ piles. b.

More

METHOD OF STATEMENT FOR BORED PILING INSTALLATION BY

Mar 16, 2020· Piles are either use for the foundation of super structures (buildings, bridges, towers, etc.) or as supporting deep excavations (shoring by sheet piles, secant piles, contiguous bored piles, etc.) or in special cases like installation of sand piles as vertical drains for the soil consolidation/ soil improvement or sometimes in other areas

More

Basement Construction Method Statement

The secant wall consists of interlocking bored piles. Primary (female) piles are constructed first using a ‘firm’ concrete / bentonite (commonly 10N/mm2). Secondary (male) piles, formed in structural reinforced concrete, are then installed between the primary piles with a typical interlocking of 150mm.

More

Piling Contiguous, Interlocking and Secant

This type of construction is in many ways similar to the contiguous bored pile method, except the gap between the primary piles is filled with a secondary ‘soft pile’ consisting an unreinforced weak concrete mix constructed to a depth just below the depth of final excavation. A sequence of secondary piles are constructed followed by a

More

Specification for Contiguous Bored Piling

Specification for Contiguous Bored Piling 7 October 1999 . SPECIFICATION FOR CONTIGUOUS BORED PILING. 1.0 GENERAL . 1.1 Works in accordance with Specifications . The Contractor shall carry out the works in accordance with a method statement which has been approved by the Engineer. This method statement shall include inter alia length of

More

METHOD OF STATEMENT FOR BORED PILING INSTALLATION BY

Mar 16, 2020· Piles are either use for the foundation of super structures (buildings, bridges, towers, etc.) or as supporting deep excavations (shoring by sheet piles, secant piles, contiguous bored piles, etc.) or in special cases like installation of sand piles as vertical drains for the soil consolidation/ soil improvement or sometimes in other areas

More

CONTIGUOUS BORED PILING

CONTIGUOUS BORED PILING. A 'slurry concrete trench' method was used to carry a new trunk road underpass over a major water supply where spread foundations were not practicable and the structure had to be protected from a possible burst water main. Excavation under a bentonite suspension down to the top of weathered mud stone was used.

More

(PDF) Contiguous Pile Wall as a Deep Excavation Supporting

There are three different bored pile wall options: contiguous piles, secant piles and tangent piles. excavation and finally calculated the cost involved in the method of steel sheet piling to

More

Bored CFA contiguous & secant pile

These wall types are constructed as cast in situ pile walls as either conventional bored piles with kelly bar rig (with or without drilling support fluid) or alternatively as CFA piles. Contiguous pile walls feature piles that are almost touching (ie. gaps between piles of 50-100mm). They are normally adopted in cohesion-less soils where the

More

Basement Construction Method Statement

The secant wall consists of interlocking bored piles. Primary (female) piles are constructed first using a ‘firm’ concrete / bentonite (commonly 10N/mm2). Secondary (male) piles, formed in structural reinforced concrete, are then installed between the primary piles with a typical interlocking of 150mm.

More

STRUCTURAL METHOD STATEMENT Islington

Piling construction methodology 1. Set up site and mobilise all necessary labour, plant and materials. 2. The contiguous bored pile wall will then be constructed in accordance with the detailed design and in accordance with the separate Method Statement depending on type of auger piles

More

Method Statement for Installation of Micropiles Welcome

Mar 26, 2019· The purpose of this method statement is to describe the method of installing micropiles as a temporary tie back supports for the temporary shoring of (Name of Project here). The shoring system designed and considered for the project is the contiguous pile wall wherein a series of piles

More

Contiguous Piling Piling Walls Performance Foundations

What are the types of contiguous piling? We use two methods of bored pile techniques for contiguous piled walls: CFA (continuous flight auger) piling removes soil with an auger while at the same time concrete is pumped through the auger’s hollow centre. Rotary piling removes soil with an auger, a reinforcing structure is inserted followed by

More

CONSTRUCTION METHOD STATEMENT

1.4 Method Statement The proposed method statement for the basement extension is outlined below: • Contactor to establish ground water level • Piling contractor to review all setting out as shown on the drawings to ensure minimum clearance dimensions are achievable, with particular reference to the exiting lower ground floor construction.

More

Method Statement for Hydraulic Piling Works

HYDRAULIC PILING, Reinforcement & Concreting This Work Method Statement outlines the method of which the bored piling works are installed for the project. i) HYDRAULIC PILING 1) Hydraulic bored piling plant shall be used. The piling plants consist of a telescopic kelly bar and the lower of the kelly bar is an adaptable to other drilling tools.

More

Method Statement of Bored Piles Construction of Piles

Jun 24, 2018· Method statement of bored piles is a construction procedure which includes hole boring into the ground, installing steel reinforcement and casting with concrete to form a pile, etc. Bored piles are constructed in the ground by boring in the circular shape of designed diameters to transfer load from the superstructure into the ground through friction and end bearing.

More

(PDF) Method Statement BORED PILING ResearchGate

The method statement for bored piling below describes the whole construction. procedures including material and equipment required for the construction of. bored cast-in-situ piles. b.

More

Bored Pile Retaining Walls Contiguous & Secant MEC Piling

Bored Pile Retaining Walls Contiguous & Secant. Continuous Flight Auger Bored Piles. MEC Piling use two methods of bored piling techniques for contiguous piled walls, CFA and rotary. Where the available working area dictates that basement excavation faces must be vertical, these two techniques provide special advantages.